41. The dam's water capacity is enough for the power station to run at full load for approximately ten hours. 42. Not until 1896 were minor changes made to the heating areas, the weights and the coal and water capacities . 43. These engines were delivered with Type XE1 tenders which had a coal capacity of and a water capacity of. 44. The first five locomotives were delivered with the first Type TM tenders, which had an coal and water capacity . 45. It was also delivered with Type MP1 tenders, which had a coal capacity of and a water capacity of. 46. All four batches were delivered with Type LP tenders, with a coal capacity of and a water capacity of. 47. They were built as 800 gallon water capacity , 4 wheel drive bushfire tankers and designated " State Spare Tankers ". 48. The Oceanographic is the largest complex of its type in Europe with a surface of and a water capacity of. 49. The expanded water capacity of the tender allows legs of over between water stops, further than the original Peppercorn A1s. 50. Many of the reboilered locomotives also received new Type MT tenders with a coal capacity of and a water capacity of.